Customer:Siemens

 

Job Title:480MW Combined Cycle Power Plant

Inspection CodeASME Section V,  Article 5 -1998

                                      Ultrasonic Examination Method for Materials

                                      ASME B31.3 –2001 Process Piping

Inspection MethodPiping  Ultrasonic Inspection of Welds

Reference Blocks:Calibration Pipe

Surface Condition:As Granding

Couplant:CMC

Search Units:Angle-Beam

Interpretation:ASNT Level III Yu, Jin-Shyan

Report:Piping  Ultrasonic Inspection of Welds

 

Customer:Formosa Petrochemical Corporation

Project:Reformer Tubes Inspection

Method:Automatic Tube Climbing - Eddy Current Inspection

Code:DIN 54 140, Part 1-3 : Theory of Eddy Current

               DIN 54 141, Part 1-3 : Eddy Current Inspection of Tubes

               DIN 54 142, Part 1-3 : Eddy Current Probes

               Description of internal specification: MP-S-001

Inspection company: Magnetische Pruefanlagen GmbH

 

Inspection team:

    MP     Mr. Helmut Jarisch

               Mr. Detlef Radtke

    CND  Mr. Ju, Jia-Cheng

               Mr. Jou, Jia-Shing

 

Customer:Hyundai Engineering &  Construction Co., Ltd.

 

Project:Taiwan High Speed Rail Project  Contract C-230

 

Method:Welds of Shear Key of Warren Truss MT

Code: AWS D1.1-2000 Sec. 6.10

              Cyclically Loaded

Calibration:  DETEK Model D-250 Magnetic Field Indicator

Clear:As Welded or Ground

Magnetizing:AC Yoke - Continuous

Particles:Tiede – Dry and Red Powder

Viewing Flashlight over 1,000 lux

Interpretation:ANST Level III - YU, JIN-SHYAN

Report:Report of Magnetic Particle Inspection of Welds

 

Customer:BUREAU VERITAS

 

Project:TAIWAN HIGH SPEED RAIL PROJECT S280

Method:CHIAYI STATION-WELDS OF STATION ROOF UT

Code: AWS D1.1-2000

             Structural Welding Code-Steel

Calibration:Standard Block A1

Clear: As Welded

Couplant :CMC

Transducer:Angle-Beam

Interpretation:ROCSNT Level II - TSAI, MING-CHIEH

Report: Report  of Ultrasonic Inspection of Welds

 
Customer:ICI Far Eastern Limited 

 

Project: Overhaul NDT Service
Method:PT- the welds of heat exchanger tubes 

Code:ASME B31.3 - 1996

             PROCESS PIPING
Precleaning:Solvent Cleaning
Penetrant:Met-L-Chek  Red Liquid Ppenetrant
Removal:Water Washable
Developer:Met-L-Chek White Water Soluble Developer
ViewingDaylight over 1,000 lux
Interpretation: ROCSNT Level II - JU, JIA-CHENG
Report:Liquid Penetrant Inspection Report

 

Customer:NOELL-Hamburg
Project: Formosa Petrochemical Corporation –
               Mailiao factory  ASME Stamp Tanks - RT              
Method:Butt  Welds of Tanks - Radiographic Examination
Code:ASME Sec. V Article 2 - 1995
              Radiographic Examination
              ASME Sec. VIII-1 UW-51 – 1995 
              Radiographic and Radioscopic
              Examination of Welded Joints
Films:FUJI #100
IQI:ASTM Wire Type
Source:Gamma Rays ( Ir-192 )
Exposure:Spot, Cylindrical and Circumferential Exposure
Manual Processing:Developer+Stop Bath+Fixer+Wetting Agent
Interpretation: ROCSNT Level II - HUANG, YUNG-TSAIE
Report:Radiographic Inspection Report

 

Customer:Bureau Veritas Taiwan Branch

Project:Ultrasonic Thickness Measurement of Seamless Pipes

Method:Deduction of the Coating Thickness

Code:JIS Z2355  -1994

             Methods for Measurement of Thickness by Ultrasonic

             Pulse Echo Technique

Calibration:Ends of the Inspection Pipes

Clear: As Coating

Couplant :Grease

Transducer:Straight-Beam with Wedge

Interpretation:ROCSNT Level II -  Lee, Shiun-Chyi

Report: Report of Ultrasonic Thickness Measurement